MVWA Home
  • Sign-In unlocked padlock
  • My Account
    • Register
    • Forgot Username/Password
    • Water Alert Sign Up!
    • Contact Us
    • Payment Locations
  • Water Quality
    • About Water Quality
    • Annual Water Quality Report
    • (AWQR Short Form)
    • (AWQR Long Form)
    • Lab Services:
    • Bacteriologic
    • Lead and Copper
    • Other Parameters
    • Price List
    • Lead Awareness
    • Safe Drinking Water Act
    • US EPA Drinking Water Regulations
    • Related Links
  • Customer Service
    • Welcome
    • Contact Us
    • Payment Locations
    • Property Search
    • FAQ Services
    • Money Saving Tips
    • H.E.L.P.
    • LIHWAP
    • Did You Know
    • Cold Weather Concerns
  • Governance
    • Home
    • Board
    • Minutes
    • Organizational Chart
    • Rules & Regulations
  • Finance
    • Financial Reports
  • Engineering
    • Capital Projects
    • Maintenance
    • List of Contractors
    • As-Built Drawing Requirements
    • Service Meter Schematics
    • Hydrant Meter
    • Service Connections
    • Mains & Services
    • Local Backflow Testers
    • Tap Application
  • Announcements
    • Announcements
    • Bid Invitations
    • Job Openings
  • UMVRWFA
    • Members/Committees
    • Minutes

Engineering

  • Capital Projects
    • Project Reports
    • Bid List
    • Bid List Application
  • Maintenance
  • List of Contractors
  • As-Built Drawing Requirements
  • Fire & Combined Service Meter Schematics
  • Hydrant Meter Set Up
  • Hydrant Inspection Training Video
  • Service Connections - Application Instructions
  • Material Specifications-Mains & Services
  • Local NYS DOH Certified Backflow Testers

Form Requests

  • Tap Application

Project Reports

The Capital Project Committee Reports below include brief project descriptions and project photographs.

  • Terrace Hill Drive Water Main - July 2022
  • Southern Reservoir FEMA Damage Repairs - July 2022
  • Distribution System SIPP Rehabilitation (Phase 1) - July 2022
  • Deerfield Tank Slope Stability - July 2022
  • Welsh Bush Road Water Tank Rehab - October 2021
  • Southern Reservoir Access Road - September 2021
  • Linda Drive Railroad Crossing 24" Transmission Main Replacement - November 2020
  • Snowden Hill Road Water Storage & Mains - October 2020
  • Large Valve Replacement Program - October 2020
  • Snowden Hill Road Water Storage Tank - June 2020
  • Phase 2 Raw Water Mains - Hinckley to WTP - June 2020
  • Cavanaugh Road 24” By-Pass Water Main - June 2020
  • Snowden Hill Road Water Storage Tank - May 2020
  • Pond Lane PRV Chamber Installation - May 2020
  • Marcy Reservoir Breaching - May 2020
  • Kemble Maintenance Facility - October 2019
  • Hinckley Bank Stabilization - October 2019
  • Cavanaugh Road - October 2019

REPORT WATER LEAK OR EMERGENCY:
315.792.0301

Annual Water Quality Report MVWA Facebook X (Twitter)
Contact Us via Web

1 Kennedy Plaza
Utica, NY 13502
Fax 315.792.4722
© 2025 MVWA