Contractors must adhere to the specific materials found in this document or obtain written MVWA approval for proposed equivalents prior to installation.
If proposed equivalent materials are installed that are not pre-approved, the MVWA reserves the right to stop construction (and not provide water service until suitable materials are installed) or accept the work.
Contractors must supply the MVWA with a list of all material specifications (make, model, size, quantity, etc) on projects requiring As-built drawings. Refer to MVWA As-built Drawing Requirements for complete requirements.