Capital Improvement Program

Cavanaugh Road 24-Inch Water Main Upgrades

October 2019


surevey machine on tri-pod aimed down the dirt road, while on grassy knol, 
                water tank in far background

Setting Grade for Pipe Route

view of work area, hydrant in forground, excavator and water tank in background

Preparing Grade for Pipe Installation

excavator, bulldozer and skidsteer loader working to prepare way for the pipe installation

Preparing Grade for Pipe Installation

nine stacks of Materials Stockpile and Erosion Control in forground, crawler
                excavator to left center and water tower in center background

Materials Stockpile and Erosion Control Established